Home | Contact Us | Careers | News | Search |

LIVING> West Quesnel Land Stability

Detailed Technical Information

Over the last several years, the City of Quesnel, in partnership with its consultants - Urban Systems and AMEC - Environment & Infrastructure, has compiled a vast library of resource materials, scientific findings and technical reports.

Please click on the items in the right column for a more detailed look at the West Quesnel Land Stability Program.

Please note that some files are quite large, requiring a broadband internet connection for optimal download conditions.

Latest detailed information

2015 Annual Monitoring Report
February 2016
Full Report - print qaulity (84 MB)
Full Report - faster vewing (44 MB)

2014 Annual Monitoring Report
Full Report January 2015 (62.40 MB)

2012 Subsurface Dewatering System (two parts)
Volume 1 or 2 (20.9 MB)
Volume 2 or 2 (123 MB)
November 2014

2013 Annual Monitoring Report
Full Report March 2014 (full report is 52.20 MB)

2012 Annual Monitoring Report
Full Report April 2013 (full report is 28.24 MB)

2011 Annual Monitoring Report
Full Report January 2012 (full report is 35.18 MB)

2010 Monitoring Results
Full Report February 2011 (full report is 29 MB)

2009 Monitoring Results
Full Report February 2010 (full report is 20.9 MB)

2008 Monitoring Results
Executive Summary
Full Report
March 2009 (full report is 9.50 MB)

2008 Trial Dewatering (draft)
Full Report May 2008 (full report is 42 MB)

2007 Draft Report on Land Stability Study and Recommendations (two parts)
Volume 1 of 2 covers Reports and Figures
Volume 2 of 2 covers Appendices
May 2007
(vol 1 = 13.5 MB)
(vol 2 = 144.8 MB)

Maps

Land Stability Study Area Map
Aerial Street Photo small
Aerial Street Photo wide
Monitoring Map 1 04/15/05
Monitoring Map 2 04/15/05

Downloadable PDFs

Certain downloads may need a broadband connection as some sizes are large.

Summaries & Introductions:
January 2001 1.19M
March 2001 1.06M
December 2002 1.24M
January 2004 2.41M
May 2004 27kb
April 2005 129 kb

Ground Movement Readings:
January 2001 2.29 M
March 2001 3.63 M
December 2002 4.53 M
January 2004 12.41 M
May 2004 14.54 M
April 2005 13.6 M

Technical Reports:
October 2002 Executive Summary and Appendix A (399 kb) and Appendices B to K (79 mb)

May 2004 Pilot Dewatering Well Test
Appendices A to I

Menu

Introduction

Overview

News

Reports

Committee

Documents

Land Stability Study Area Map

Building in West Quesnel

Contact and Location

City Hall
410 Kinchant Street
Quesnel, BC V2J 7J5
250.992.2111 (t)

Business Hours

8:30 a.m. to 4:30 p.m., Monday to Friday (excluding statutory holidays)